FOR BOOKKEEPERS LEAVING HOURLY BILLING
Stop Selling Hours. Start With This Switch Check.
The checker behind the article: inventory what repeats, test every tier against your floor, and move clients in phases you can fix.
Every entry comes from your own client records. Published guide patterns are labeled as published patterns.
THE SHORT ANSWER
Package the repeating work. Keep hourly for the unknowns.
For recurring monthly work, packages usually beat hourly billing. Hourly revenue is capped by the hours in a day, and the model pays you less as you get faster, because every system you adopt removes billable minutes while the value to the client stays the same. Keep hourly or project pricing for one-off work with unknown scope, such as cleanups and diagnostics.
This checker builds the switch from your own records: your last three months of recurring work, your floor price for each tier, and a phased move that starts with one or two clients.
THE SWITCH CHECKER
Three parts. One phased switch.
Two checks are visible below. The full checker, the inventory worksheet, the floor test, and the phased move, opens after a short signup.
Inside the full checker
- Price the bundle, then check the floorConverting your hours into a flat fee hides the clock instead of removing it. The checker prices the outcome bundle first, then tests it against the lowest fee that covers your costs plus a margin.
- One or two clients firstA phased rollout lets you refine the tiers, the prices, and the wording on friendly clients before the rest of the list hears about the change.
Get the full Hourly to Package Switch Checker
Tell us where to open it and the full checker unlocks on this page: the recurring work inventory, the tier floor test, and the phased client move, ready to work through and print.
Part 1: Inventory the recurring work
- Last three months listed per clientPull your own last three months, client by client. Mark every task that repeated monthly, every one-off, and every request that arrived outside any agreement.
- Repeating work separatedThe repeating list is your package material: recording, reconciliation, filing, payroll, reporting, reviews. If it did not repeat, it does not go in a tier.
- Unknown scope kept outCleanups, catch-up projects, and diagnostics stay project priced or start with a paid review. They join a package only when the monthly pattern is visible.
- Outside requests named as add-onsEvery recurring outside request gets a name and a price as an add-on, so scope has a price before it has an argument.
Part 2: Test each package
- Three tiers, written in outcomesCore covers the recurring basics. Middle adds reporting and a regular review. Top adds forecasting, budgeting support, and advisory access. Each tier is a list a client can read in one minute.
- Floor price set for every tierWrite the reservation price: the lowest fee that covers your costs plus a reasonable margin. No tier ships below its floor.
- Expected and ideal prices written tooSet the fair expected price and the ideal price next to the floor, so negotiation moves inside a range you chose in advance.
- Recent totals compared honestlyPut each pilot client recent monthly totals next to the tier that covers the same work. If the package only wins by copying old hourly totals, reprice the outcome instead.
Part 3: Move clients in phases
- Pilot with one or two clients, or a new client firstChoose stable, predictable work and a good relationship. Refine tiers, prices, and wording on the pilot before any wider rollout.
- Choice given in writingEach client sees what is included, what is an add-on, and which tier fits their current work. The pick is theirs, recorded in writing.
- Metrics tracked from month oneTrack average revenue per client, retention, and margin per engagement from your own figures. Those three numbers say whether the switch is working.
- Review date bookedPackages get a review date at signing. Prices and scope are adjusted with real data at the review, not defended as first guesses.
WHY IT WORKS
Why the switch has to be checked, not announced.
Most failed switches fail in one of two places: the package was just old hours in a flat wrapper, so the ceiling and the efficiency penalty came along, or every client was moved at once, so the first pricing mistake became a firm wide argument. A written three part check removes both. The inventory is yours, the floor is yours, and the rollout is small enough to fix.
That is how we run the bookkeeping side of the network. Business Hub OS and the Bookkeepers Growth Network keep the follow-up, the document chasing, and the client questions in one flow, so the hours a package frees up go into review and advisory work instead of admin.
STRAIGHT ANSWERS
Asked often,
answered up front.
What work should stay hourly or project priced?
One-off work with unknown scope: cleanups, catch-up projects, and diagnostics. Package the work that repeats every month. Move a cleanup client onto a package only after the books are current and the monthly pattern is visible.
How does the Hourly to Package Switch Checker work?
You work three parts in order: inventory the recurring work from your own last three months, test each package against your floor price and written scope, then move clients in phases starting with one or two. Every entry comes from your own client records.
What does the checker cost to use?
Nothing. Enter your details above and the full checker opens on this page, ready to work through and print.
NEXT STEP
Want the freed hours to go somewhere useful?
Business Hub OS keeps the follow-up, the document chasing, and the after-hours questions in one flow, so the hours a package frees up land in review and advisory work. Book a discovery call and we will map it with you.
Or start at the top: run your last three months against Part 1 today.
Join the networkFree Consultation